View Single Post
Old 07-24-03, 08:41 PM   #20 (permalink)
DRCaldwell
Aximsite Rookie
 
Join Date: Jun 2003
Location: DC
Posts: 35
Thanked 0 Times in 0 Posts
Delivery dates?

I wonder if the Sept timeframe applies to the hardware (Axim Units) as well? If so, I wish they would simply ship it with PPC2002 and upgrade later.

Last edited by DRCaldwell; 07-24-03 at 08:49 PM.
DRCaldwell is offline   Reply With Quote