View Single Post
Old 05-19-04, 06:42 AM   #1 (permalink)
jclick
Aximsite Prospect
 
Join Date: Jul 2003
Location: Concord, NC
Posts: 17
Thanked 0 Times in 0 Posts
Problem with re-occuring tasks

Hi,
I have a Dell Axim 5 w/PPC 2002. I use MS Activesync 3.7.1. I sync with 2
pc's... one running W98SE (w/Outlook 2000) and the other WXP Home Edition
(w/Outlook 2002). Here is my situation. I have a task setup in my PPC to
occur every monday (a reminder to backup the PPC). I perform this task and
then check off on the W98SE Machine (in Outlook). It then syncs and checks
it off on my PPC. Well, when I then sync with the WXP machine, Outlook shows
the task overdue with a date of about 3 weeks ago. I check that off and then
it shows the task with the date of 2 weeks ago. It continues this until the
current task is checked off. If I look at the PPC tasks, it shows multiple
occurences of the task checked off. When I then sync with the W98SE machine,
it does the same thing. It shows overdue tasks and I have to check them off
until the current one is checked off.

This seems to happen on all of my re-occuring tasks. By the way, I am
running Agenda Fusion 5.4.1 on the PPC.

Let me know if I need to explain some things better. I know when I'm typing
this, I know exactly what I'm trying to say but, it may not be so clear to
everyone else!

Thanks,
Jason
__________________
-jasonclick

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

Last edited by jclick; 04-10-06 at 06:08 AM.
jclick is offline   Reply With Quote