View Single Post
Old 12-29-04, 01:17 PM   #1 (permalink)
BooDa
Aximsite Major League
 
Join Date: Dec 2004
Posts: 333
Thanked 0 Times in 0 Posts
Screwy Calendar Sync Problem

OK,I'm about ready to pull my hair out. My desktop Outlook contains data imported from two iCal-compatible web calendars. The data all shows up correctly on the desktop. Most of the data - all day events, appointments, holidays, etc. - also shows up correctly on my Axim.

The problem is that there are a number of events that are "zero duration" - they were originally created with a start time but no end time. Outlook on the PC treats them as beginning and ending at the same time. That's fine and they show up correctly on the desktop calendar. On the Axim, however, they all show up one day later than they should. They are also converted into all-day events on the Axim.

My desktop and Axim have the same time zone settings, "automatically adjust for daylight savings" is checked on the desktop, and the Axim is set to local time. I've tried everything else I could think of, including a hard reset. The dates still showed up wrong on the clean Axim, before I did a restore.

Right now the only option appears to be manually adding an end time to each zero-duration event. Hopefully someone here has a better solution?
BooDa is offline   Reply With Quote