View Single Post
Old 03-26-05, 03:26 PM   #1 (permalink)
joleta
Aximsite Prospect
 
joleta's Avatar
DAP Site StaffDAP Site StaffDAP Site Reviewer
 
Join Date: Mar 2005
Posts: 13
Thanked 0 Times in 0 Posts
Migrating to new PPC

I'm expecting my new Axim X50v next week and am thinking about the right way to migrate everything in my HP Jornada 560, which I'll be selling after the Axim arrives. I know I have to do a full sync and full backup of the Jornada first. But then, do I need to "erase" that partnership in ActiveSync before I install the Axim?

I guess I'm looking for a step-by-step tutorial on how to move from an old PPC to a new one, and then eliminate the old one. Is there anything I should move to the Jornada's SD card so I can load it into the Axim from there? I'm thinking of my HanDBase databases, which I don't think are synced to the PC.

Thanks for your help.

Barbara
joleta is offline   Reply With Quote