View Single Post
Old 04-28-05, 03:04 PM   #5 (permalink)
johnyaxim
Aximsite Rookie
 
Join Date: Sep 2004
Posts: 38
Thanked 0 Times in 0 Posts
[IMG]C:\Documents and Settings\seabuj\Desktop\untitled.jpg[/IMG]

I'm not sure if this will work, im trying to post a picture of what im refering to. Basically if you double click on tasks you can choose 4 settings:

sync all tasks
sync only incomplete tasks
sync tasks depending on selected dates

and

sync only those tasks in the selected catagories, then you can choose the task catagories you use in outlook. When i do this it ignores the catagories i ask it to sync with, and instead sync's all of my tasks. FOr example if i have my tasks in 2 catagories, to do, and work. and i only want to sync to do, i check the to do catagory when im in the tasks options in activsync. Then when i sync it should only sync that catagory. But it insteads sync's all.

I hope that makes sense. Thanks again for all your help
johnyaxim is offline   Reply With Quote