|
Ok, I received a response from Sprite Software. Here is their reply:
There have been some reported problems with starting scheduled backups which we are currently looking into, but this is the only known issue with PPC2003. We will be correcting this problem in a release in the near future (probably 2.1.3 – 2.1.2 is in final testing now).
__________________
There are only two truly infinite things, the universe and human stupidity; I am unsure of the former.
-Albert Einstein
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
|